Panorama Village Building
Panorama Village Building
Since the opening of the Mount Nittany Elementary School in the fall of 2011, the Panorama Village building has been vacant. The Board of School Directors authorized a feasibility study to determine future utilization potential for this building. Based on that study the Board has authorized design of a phase 1 project, which will include the relocation of print shop services from the College Heights building, relocation of Physical Plant services from the Nittany Ave. and Fairmount Ave. buildings, and a district-wide meeting space. The preliminary floor plan and schedule for this project can be accessed at the links below: